Questions

Frequently asked questions about the EPC

Can’t find your question here? Just call or email me.

When and why

When is an EPC (energy performance certificate) required?

When a house or apartment is sold or let. Buyers or tenants must already know the label when the property is put on the market for sale or rent. See vlaanderen.be.

How long is an EPC valid?

10 years. After a major energy renovation you can have a new EPC drawn up.

Does an EPC also apply to apartments?

Yes. Every house and apartment you sell or let needs a valid EPC.

Where can I find my EPC?

A registered EPC is stored in the Woningpas (the Flemish home passport), the government’s online file for your property, which you can consult at any time.

The site visit

How long does the site visit take?

1 to 3 hours on average, depending on the size and complexity of the property.

Do I need to be at home during the site visit?

No. A key is enough, or someone else who can give access to the property: all rooms, the attic, the cellar and the technical areas.

What needs to be accessible?

All rooms and floors, the attic, the cellar and crawl spaces, the boiler or heat pump, the ventilation and the solar panel inverter. Make sure there is safe access to an attic without a fixed staircase.

What is the checklist (aanstiplijst)?

An official overview of possible supporting documents. You receive it in advance so you can prepare easily. It records which documents you have provided.

Supporting documents and result

Why are supporting documents so important?

Without proof I am not allowed to assume that a wall is insulated or that glazing has a certain value. Default values then apply, and these are often less favourable. See the guide Preparing your EPC.

What if I find an invoice after the visit?

That is what the draft version is for. I can still process additional supporting documents before I register the EPC, provided they meet the inspection protocol.

Can I find out what a renovation would achieve?

Yes, with EPC simulations I compare renovations by label and consumption. See renovation advice.

Price and planning

How much does an EPC cost?

That depends on the type of property, its size and its complexity. You receive a clear final price in advance, with no VAT added. See prices.

When will I have my EPC?

You usually receive the draft version within 3 working days of the site visit. Once you approve it, I usually register the EPC within 1 working day.

When and how do I pay?

After the EPC has been registered. You pay by bank transfer or by scanning the QR code on the invoice with your banking app.

Which municipalities do you cover?

Leuven and the surrounding area, within about 20 km: from Herent and Bierbeek to Tienen and Aarschot. See the area I cover.

Need an EPC in the Leuven area?

Leave your details. Within 48 hours I will send you a clear price and suggest a time for the site visit.