Why does good preparation help?
A site visit is mandatory for an EPC. I measure the home and examine the insulation, the glazing, the heating system, the production of domestic hot water, the ventilation and any renewable energy installations.
Not everything is visible. Insulation may be hidden behind walls, ceilings or other finishes. That is why I ask you to gather as many documents as possible in advance about the original construction and any later renovation work.
With valid supporting documents I can establish the actual properties of your home accurately. Whatever I cannot see and you cannot demonstrate, I must fill in with the prescribed VEKA default values. These are often less favourable than the situation as built.
Supporting documents do not automatically lead to a better label. They do prevent existing insulation, high-efficiency glazing or an economical installation from being left out of the calculation.
How does the site visit work?
A site visit takes 1 to 3 hours on average, depending on the size and complexity of the home. I don’t rush: I want to establish and measure every element correctly, even if that takes a little longer.
I go through the rooms and the technical installations, note what I see and review with you the documents you have gathered. On site I ask exactly what you built or renewed, so I don’t have to guess and you don’t have to repeat anything.
After the visit I first send you a draft version to check. You can read it through at your own pace before the final registration takes place. If you find another supporting document after that, I will still process it, provided it meets the inspection protocol.
You can read more about the steps on the how I work page.
Which documents can you gather?
You don’t need to have everything: send what you can find. These are the most common supporting documents.
- Building plans of the original construction or later renovations, signed by the architect.
- Documents showing the year of construction or renovation, such as a building permit, an application for a planning or environmental permit, or other official information. Sometimes you can also find this information in the Woningpas (the Flemish home passport).
- Specifications (lastenboek) from the architect or contractor, signed by the contractor and the client. If they are not signed, a building contract that clearly refers to them is sufficient.
- Contractors’ invoices showing the address of the home and the work carried out, for example insulation, new windows or a boiler.
- Invoices or delivery notes for building materials if you did the work yourself, with enough information to link them to your home.
- Photos taken during the work, in which the material and its location are clearly recognisable.
- Reports of tests or measurements, such as an airtightness test or a report of a limited destructive investigation.
- A previous EPC or EPB declaration (the energy performance declaration filed after a new build or major renovation).
- Documents about installations: inspection report, invoice or technical documentation for heating, heat pump, solar water heater, solar panels or ventilation.
Is every document automatically valid proof?
No. Not every document meets the requirements. I assess which information may actually be used for your EPC under the applicable VEKA inspection protocol.
Sometimes one document is not enough to demonstrate a property. An invoice without an address or without a description of the material proves little, but combined with photos or specifications it may be sufficient. So I look at the whole picture.
Not sure whether a document is usable? Send it to me in advance. I check what information it contains and whether it can be used under the inspection protocol. That way you know where you stand before the site visit.
The sooner you send documents, the more time I have to check them. So please send me all the documents you have before the site visit takes place.
What if the insulation is not visible anywhere?
Sometimes hidden insulation can still be established through an existing opening or one made in advance, for example at a recessed spotlight, a wall vent or an unfinished section.
If there are no valid supporting documents, you as the owner can choose to have a limited destructive investigation carried out before or during the site visit. This investigation is not part of the energy assessor’s standard work. You prepare and carry it out yourself, or have it done by a suitable professional.
The finding only counts if I can see the insulation material and, where applicable, its thickness clearly enough on site. In certain cases I also accept unambiguous overview and detail photos or a sufficiently documented report, provided they meet the inspection protocol.
Only let an authorised or suitable professional open electrical components, roof seals and other risky parts of the structure.
Which areas should you make accessible?
Keep any keys to locked rooms to hand. If an installation is behind a lock, I cannot assess it. For an attic without a fixed staircase, safe access must be arranged in advance. If the home is let, inform the tenant in good time as well.
If furniture or storage boxes are in front of a radiator, an access hatch or a wall I need to measure, move them aside beforehand. That way I don’t lose time and can look at everything calmly. The more easily everything is accessible, the shorter and calmer the visit.
If possible, make sure the following areas and installations are accessible:
- all rooms and floors;
- attic spaces;
- cellars and accessible crawl spaces;
- boiler, heat pump and storage tank;
- ventilation system;
- technical rooms;
- shared boiler room, if applicable;
- inverter and available information about solar panels;
- places where insulation is visible or accessible.
What is the checklist (aanstiplijst)?
Before the site visit you receive the official checklist, with an overview of all possible supporting documents. Read it through in full beforehand and gather the documents that exist for your home.
During the site visit we go through the checklist together and sign it. This records which documents you have provided.
The checklist only confirms what you have provided. It does not mean that every document can also serve as proof. I assess that on the basis of the applicable inspection protocol.
A well-prepared list makes the visit calmer, because we don’t have to search on site for what exists. If you would like to get started, you can request your EPC directly from me.
If you don’t recognise a document on the list, just note where you might find it, for example with the architect, the contractor or in the notary’s file. Then we can decide together what is still worth looking for.
Why are supporting documents important?
Without supporting documents, as an energy assessor I am not allowed to simply assume that the following points are correct. If I cannot establish them on site and you cannot demonstrate them with a valid supporting document, I apply the default values and assumptions from the inspection protocol. That is not my choice, but a requirement.
These default values are often less favourable than the actual situation. Good preparation therefore leads to a more accurate EPC and reduces the risk that energy improvements to your home are left out of account.
A home that is in reality well insulated can still end up with a lower label, simply because the proof is missing. That is a shame, especially when an invoice or a photo could have solved it.
- a wall or roof is insulated;
- a certain insulation thickness was installed;
- glazing has a specific insulation value;
- a heating system achieves a certain efficiency;
- renovation work was carried out in a certain year.
What else can I do for you?
If you want to know what renovations could change about your label, I can draw up renovation scenarios on request. You can read more about this on the page about renovation advice and EPC simulations.
If you have questions about your documents or the approach, you are welcome to call or email me. You speak to me directly. I would rather answer a question beforehand than find out afterwards that a supporting document is not sufficient.
If you want to know how to read the label afterwards, the guide reading your EPC score will help.
If you are unsure whether you can prepare anything yet, start with the documents that are easiest to find, such as invoices for recent work and the plans of the home. That is a good start.